2013-11-23, 10:39
Hi
I have a small problem in the timeline view of the EPG. Whenever there are programs that span a longer period of time i can no longer move forward or backward in the EPG... Now i have to move to a different channel in the timeline to continue forward.
http://imgur.com/JVT1a5U
Is there some way of jumping with fixed intervals (30min, 1h,...) through the timeline?
Thanks
I have a small problem in the timeline view of the EPG. Whenever there are programs that span a longer period of time i can no longer move forward or backward in the EPG... Now i have to move to a different channel in the timeline to continue forward.
http://imgur.com/JVT1a5U
Is there some way of jumping with fixed intervals (30min, 1h,...) through the timeline?
Thanks